Looking towards the front entrance to the high school
|
 |
this is the new filled area; looking directly at Mosside School
|
 |
another view of the filled area & Mosside School
|
 |
the new roadway will be to the left side of this photo adjacent to the retaining wall
|
 |
the front of the high school auditorium; brick wall has been demolished
|
 |
the old entrance to the school office.
|
 |
inside the auditorium; all ceiling and wall material has been removed.
|
 |
this is the back foyer of the auditorium; the entrance to the auditorium control room is inside the concrete block wall in the center of the photo.
|
 |
this is stage left; the ticket window was inside the area now containing the stacked sheets of construction material.
|
 |
the front of the stage has been removed and you can see straight under the stage into the tunnel system
|
 |
stage left; in the top of this photo was one of the hidden storage rooms that was behind a wooden lattice. below in the center of the photo is the janitor room/ticket office.
|
 |
standing in front of the stage looking to the rear of the auditorium. You can see the old wooden walkway above the auditorium.
|
 |
looking towards stage right. The former in-school suspension room is behind this loader, which is parked inside the old stage crew office.
|
 |
standing on the soon to be demolished stage looking towards stage left
|
 |
standing on the stage looking towards the stage crew room and stage right
|
 |
this is the walkway system above the auditorium
|